NEWS
News
We share news about our daily challenges to make an impact on society, the evolution of our business, and the journey of growth we’ve taken alongside our colleagues. Here, we’ll introduce each step we’re taking to shape the future.
May 26
2026
KCMG Faces a Tough Test at the SUPER FORMULA Suzuka Doubleheader, Scoring No Points
NEWS

Race Report 2026 All-Japan Super Formula Championship | Rounds 4 & 5 | May 23 (Sat) & 24 (Sun), 2026 | Suzuka Circuit: A tough test with no points in either race. We’ll identify the issues and work to get back on track for the mid-season […]

May 21
2026
[TV Appearance] Our CEO, Liu Rongjun, Appears on "Dream Heritage": Toward a "Future Where Spaces Are Digitized"
NEWS

Our CEO, Liu Rongjun, will appear on TV Tokyo’s “Dream Heritage ~Dreams for the Future~.”    [Air Date] Monday, May 25, 2026, 10:58 p.m. – 11:04 p.m.    🔳About the Program “Dream Heritage” is a show that explores “the future […]

May 18
2026
[Update] Now supports batch area measurement for sloped and uneven surfaces
NEWS

nat has released new features for its 3D space scanning app, Scanat.”    This update significantly enhances the area measurement functionality, enabling the calculation of areas on sloped surfaces and in spaces with uneven surfaces such as columns (ceilings, walls […]

May 18
2026
[May 27–28] The Latest Technologies Gather in Hokkaido! We’ll Be Exhibiting at the “Hokkaido Civil Engineering and Construction Future Technology Expo 2026”
EVENT

▼ Exhibition Overview Exhibition Name: Hokkaido Civil Engineering and Construction Future Technology Expo 2026  Date and Time: May 27 (Wed) – 28 (Thu), 2026, 9:30 a.m. – 4:00 p.m.  Venue: Daiwa House Premist Dome (1 Hitsujigaoka, Toyohira-ku, Sapporo, Hokkaido) Admission: Free (Subject to […]

May 11
2026
nat team KCMG Takes the Podium in the KYOJO CUP Season Opener!
NEWS

KYOJO CUP 2026 Rd. 1 Race Report | nat team KCMG Race Report KYOJO CUP 2026 | Round 1 Final |&nbs […]

May 11
2026
[Seminar Video] 58% Reduction in Survey Time and 33% Reduction in Staff! Kotobuki Construction Presents the "Tunnel and National Highway DX Seminar"
NEWS

   [Seminar Table of Contents] 0:00– 1. Opening 0:49– 2. Kotobuki Construction: Company Introduction 8:36– 3. Scanat 9:46– 4. Challenges on the Job Site 10:53– 5. [Must-See!] Features and Benefits on the Job Site […]

May 8
2026
[May 13–15] Exhibiting at the "Housing Business Fair 2026," a trade show specializing in the construction industry
EVENT

▼ Exhibition Overview Exhibition Name: Housing Business Fair 2026  Date and Time: May 13 (Wed) – 15 (Fri), 2026, 10:00 a.m. – 5:00 p.m.  Venue: Tokyo Big Sight, South Hall 4 [S7-21] (3-11-1 Ariake, Koto-ku, Tokyo) Admission: Free […]

05-07
2026
[May 13–15] Exhibiting at "Local Government & Public Sector Week 2026," one of Japan's largest trade shows for local governments and the public sector
EVENT

▼ Exhibition Overview Exhibition Name: Local Government & Public Sector Week 2026  Date and Time: May 13 (Wed) – 15 (Fri), 2026, 10:00 a.m. – 5:00 p.m.  Venue: Tokyo Big Sight, West Hall 2 [G14-49] (3-11-1 Ariake, Koto-ku, Tokyo) Admission […]

04-28
2026
Notice of the Opening of the Matsuyama Office
NEWS

We would like to express our sincere gratitude for your continued support. nat., Ltd nat is pleased to announce that we have opened a new office in Matsuyama City, Ehime Prefecture, to expand our business and strengthen our support system in key areas. We hope to use this opportunity to […]

April 27
2026
[Case Study] Completing Asbestos Surveys Single-Handedly: A Practical Example Showing a 90% Reduction in On-Site Labor and Over 80% Efficiency Improvement in Record-Keeping
NEWS

▼ Highlights of This Case Study Challenge: Surveyors and contractors had to work side by side, resulting in a massive amount of administrative work, such as organizing photos and creating ledgers. Solution: Scanat to streamline photo organization using scanned data and facilitate smooth on-site collaboration through 3D models. […]

April 17
2026
[Customer Case Study] Renovation DX: Reducing Drawing, Quotation, and Proposal Workload by Approximately 60% A Practical Example of Breaking Free from Reliance on Experienced Staff
case

▼Highlights of This Case Study Challenge: A significant amount of time was being spent on drawing creation and proposal work, and man-hours were increasing due to rechecks and revisions. Implementation: Scanat with the goal of “capturing the entire site in a single scan.” Results: Time spent on design and estimating was reduced by approximately 60%. Junior staff […]

April 10
2026
[Customer Case Study] Tackling Labor Shortages in Regional Infrastructure (Road) Construction: Achieving "Zero Return Visits for Site Surveys"
case

▼Highlights of This Case Study Challenge: An inefficient workflow had become the norm, requiring 2 to 4 people for on-site surveys and assuming the need for follow-up visits. Implementation: Aiming for a workflow that “can be completed in a single on-site survey,” the site was digitized into 3D data Scanat. Results: On-site work can now be handled by a single person, […]

© 2022 - 2026 nat Inc. All rights reserved.