case
07-13
2026
[Customer Case Study] Free Yourself from Rain, Wind, and Elevation Changes with Just One Smartphone! 3D Scanning for Site Surveys in Exterior Construction and Landscaping Cuts Time by 90%
NEWS

▼Highlights of This Case Study Challenge: It was difficult to survey complex shapes, such as existing walls, rocks, and trees. Other challenges included the physical strain caused by weather conditions (extreme temperatures, rain, and strong winds), as well as errors in manual surveying and the need for rework. Implementation: Following a recommendation from a trusted source,Scanat . With intuitive, video-like operation […]

May 28
2026
[Customer Case Study] Renovation DX by a "Construction Firm Where One Person Handles Both Design and Site Management": How They Cut Overall Workload by About 50%
case

▼Highlights of This Case Study Challenge: [New Construction] Surveying a site with elevation differences required at least two people and was extremely labor-intensive. Furthermore, due to changes in the law, the importance of accurate elevation data had increased. [Renovation] Site inspection to proposal […]

04-27
2026
[Case Study] Completing Asbestos Surveys Single-Handedly: A Practical Example Showing a 90% Reduction in On-Site Labor and Over 80% Efficiency Improvement in Record-Keeping
NEWS

▼ Highlights of This Case Study Challenge: Surveyors and contractors had to work side by side, resulting in a massive amount of administrative work, such as organizing photos and creating ledgers. Implementation: To streamline photo organization using scanned data and facilitate smooth on-site collaboration through 3D models,Scanat […]

April 17
2026
[Customer Case Study] Renovation DX: Reducing Drawing, Quotation, and Proposal Workload by Approximately 60% A Practical Example of Breaking Free from Reliance on Experienced Staff
case

▼Highlights of This Case Study Challenge: A significant amount of time was being spent on drawing creation and proposal work, and the workload was increasing due to the need for rechecks and revisions. Implementation: Aiming for an operation where “the site is captured in a single visit,”Scanat [...]. Results: Design and quoting time was reduced by approximately 60%. Junior staff [...]

April 10
2026
[Customer Case Study] Tackling Labor Shortages in Regional Infrastructure (Road) Construction: Achieving "Zero Return Visits for Site Surveys"
case

▼Highlights of This Case Study Challenge: An inefficient workflow had become the norm, requiring 2 to 4 people for on-site surveys and assuming that follow-up visits would be necessary. Implementation: Aiming for a workflow that “can be completed in a single on-site survey,”Scanat we digitized the site using 3D data. Results: On-site work can now be handled by a single person, […]

04-03
2026
[Customer Case Study] On-site survey time reduced to 1/12 of the previous amount. How 3D technology cut store renovation work by up to 90%
case

▼Highlights of This Case Study Challenge: The process from on-site surveys to drawing creation took up to 12 hours, and missed measurements and repeat visits had become the norm. Solution: By using iPads for scanning and outsourcing drawing creation, the entire process—from on-site surveys to drawing creation—was streamlined. Results: Work time was reduced by up to approximately 90 […]

March 31
2026
[User Guide] Tips for Integrating Scanat with "Walk in home"
NEWS

natAt [Company Name], we are conducting interoperability testing to ensure that data measured using our 3D scanning app, “Scanat ” to ensure that data measured with it can be utilized more smoothly in practical applications. In this update, we are focusing on data integration with “Walk in home” and the creation of “cross-sectional views […]” of previously captured models.

March 9
2026
【Customer Case Study】Significantly Improved Communication Effectiveness in Field Briefings. New Site Management with "3D Sharing" Advancing in Private Civil Engineering Projects
case

▼Highlights of This Case Study Challenge: Photographs failed to convey the overall layout of the site, as well as the slopes and narrow passages, making it difficult for stakeholders to understand the situation. Solution: Recognizing its simple usability and high cost-effectiveness,Scanat [Solution Name] was adopted. Results: The site can now be shared instantly using 3D models […]

02-09
2026
[Customer Case Study] 30% Increase in the Number of Quotes Generated: How to Maximize Sales by Reducing On-Site Inspections Using 3D Technology
NEWS

▼Highlights of This Case Study Challenge: Insufficient photos and drawings when sharing information from the sales team to the construction department. The workload associated with on-site surveys was heavy. Implementation: Rolled outScanat . Sales representatives use a single iPhone to perform 3D scans of sites. Results: The number of quotes prepared increased by 30 to 5 […]

02-02
2026
【Customer Case Study】Drawing time reduced from 60 minutes to 5 minutes. Damage assessment professionals achieve "on-site surveys completed during a train ride."
case

▼Highlights of This Case Study Challenge: “Finalizing drawings” after on-site surveys took one hour, which was leading to frequent overtime. Implementation: The intuitive user interface and comprehensive support system were the deciding factorsScanat . Results: The redrawing process is now completed in about 5 minutes. There’s no need to return to the office, and while on the move […]

01-28
2026
【Customer Case Study】Eliminating "Unbuildable" Sites Without Drawings: 3D Collaboration Connecting Mexico
NEWS

▼Highlights of This Case Study Challenge: An exhibition in a historic building without architectural drawings. Risk that the “thickness of the columns” could not be conveyed, making construction impossible. Solution:Scanat We created a 3D model of the space and shared the data with a team of architects in Mexico. Results: The 3D model served as a “common language,” facilitating remote collaboration with international partners […]

12-09
2025
[Series] Learning from Mr. Yoshigaki! Scanat: Renovating a Toilet Facing Stairs
NEWS

We’ve released the fourth installment of our “Learn from Mr. Yoshigaki!Scanat Tips" video series—which solves on-site problems in just 2 minutes—has been released. We created this episode in response to the many requests we’ve received asking, “How is 3D scanning actually used on construction sites?” […]

© 2022 - 2026 nat Inc. All rights reserved.